Togo: Potable Water Supply Project – Tomety Phase 5

Contexte

•Location : The project takes place in the villages of Agodomé, Kokouhoe, Houglo, Atatikope, Temanou, and Bedjeme.
•Beneficiaries : Nearly 6,000 people in 2025, reaching approximately 9,000 by 2045.

𝐏𝐫𝐨𝐣𝐞𝐜𝐭 𝐒𝐭𝐚𝐤𝐞𝐡𝐨𝐥𝐝𝐞𝐫𝐬
•Contracting Authority: Village Development Committee (CVD) – Commune of Yoto 3.
•Project Manager : HSF (Hydraulique Sans Frontières).
•Local Partner : The ACDev Association (Action Charité et Développement).

gouttes eau HSF

L'action d'Hydraulique Sans Frontières

In these six villages, the current systems do not allow residents to access water of sufficient quality or quantity. Depending on the village, residents spend between 1 and 2 hours daily to collect both potable and non-potable water.
Currently, water sourcing varies across the area: Some residents fetch water from a well in Hognokondji, where the water is of very poor quality and insufficient. Others rely on wells constructed during previous phases of the Tomety project in distant villages (over 1 km away).
The village of Kokouhoe uses the Edanhoé and Lotoè streams. In Agodomé, an initial water resource assessment conducted in 2022 showed that the four village wells are silted up, collapsed, and dry up during the dry season. Rehabilitation would be extremely dangerous and maintenance is impossible. Despite this, these wells are still in use. During the dry season, inhabitants must travel approximately 4 km to another village for water.
Regarding sanitation, there are no public or private latrines in these villages. Open defecation is the norm, which contributes to the degradation of water resources and the spread of diseases.

gouttes eau HSF

Objectifs atteints

General Objective: To improve the living conditions of the beneficiaries and reduce the burden of water collection.
• Specific Objective 1: Improve access to drinking water and sanitation for the residents of the 4 targeted villages in Togo (Maritime Region).
• Specific Objective 2: Improve sanitary conditions and reduce open defecation.
• Specific Objective 3: Strengthen village community organization (operation and management) to ensure the long-term sustainability of the infrastructure.
• Specific Objective 4: Raise awareness among beneficiaries regarding hygiene best practices, water quality preservation, and the importance of sanitation.

𝐏𝐥𝐚𝐧𝐧𝐞𝐝 𝐀𝐜𝐭𝐢𝐯𝐢𝐭𝐢𝐞𝐬
• Construction of 6 wells equipped with handpumps (PMH).
• Construction of 5 VIP latrine blocks.
• Household awareness campaigns.
• Establishment of Water Management Committees.
• Training: Capacity building for financial management.

Découvrez les dernières actualités de nos projets

Feasibility study for water access, sanitation, and infrastructure management in Bassar 4 (Togo)

Heading Toward Tomety Phase 5: Construction has officially begun!